Power Infrastructure

CIDCO has constituted a separate electrical circle. CIDCO has installed transformer sub-stations and Double Pole structures in Navi Mumbai and has developed the street lighting, street and open spaces lighting. The power distribution network within the city is in Collaboration with MSEDCL. The basic objective of CIDCO's electric circle is to provide civic amenities related to power infrastructure, which include planning, installation, operation and maintenance of city.
Illumination like street-lighting, drinking water pumping plant, storm water pumping plant and sewage plant; commercial and residential complexes; Electrical and Mechanical equipment of railway projects have been provided Supervisory Control and Data Acquisition (SCADA) system for in-interrupted power supply. In Kharghar Single Window System has been introduced for power supply connections.